RCC Box Metro tunnel

Design, Procurement & Construction of RCC Box Metro tunnel including Birati UG Station building & Subways (with Entry-Exit Structures) for two underground Metro Stations (Birati & Michael Nagar) by Cut & Cover Method (Top Down with Diaphragm Wall/ Bottom Up Method with support arrangement) including architectural finishing, firefighting, water supply, sanitary installation, drainage & BLT works, E&M service, ECS Service, TVS Services, Power Supply System with 750 V DC Traction System including composite Aluminium third Rail from Ch: 6.250 Km to Ch: 9.840 Km including all ancillary works in connection with extension of Metro Railway from Noapara to Barasat via Bimanbandar
24/06/2025

Winner :

ITD Cementation India Limited

All Bidders

Rank Participant Bid price (In ₹ Cr) Difference with Tender value Difference with winner (₹ Cr)
L1
ITD Cementation India Limited
1097.23
-17.55%
L2
Ceigall India Limited
1193.66
-10.30%
96.43
L3
IRCON International Limited
1256.59
-5.57%
159.36
L4
Dhaya Maju Infrastructure Limited
1260.00
-5.32%
162.77
L5
R and C Infraengineers Pvt Ltd.
1286.08
-3.36%
188.85
L6
Rail Vikas Nigam Limited
1310.53
-1.52%
213.30
L7
Kalpataru Projects International Limited
1311.20
-1.47%
213.97
L8
Dineshchandra R. Agrawal Infracon Pvt. Ltd.
1337.52
0.51%
240.29
L9
Patel Engineering Ltd.
1483.37
11.47%
386.14
L10
AFCONS Infrastructure Limited
1575.73
18.41%
478.50