Skip to content

Cuttack to Kandarpur

Construction of new 4 lane Access controlled Highway from Cuttack (end point of CRRR at NH 16 near Tangi) to Kandarpur on SH 12 from Design Ch. 0.000 km to 21.225 under NH(O) on Hybrid Annuity Mode in the state of Odisha.
11/03/2025

Winner :

Agrawal Infrabuild Private Ltd (AIPL)

All Bidders

Rank Participant Bid price (In ₹ Cr) Difference with Tender value Difference with winner (₹ Cr)
L1
Agrawal Infrabuild Private Ltd (AIPL)
784.84
-18.99%
L2
GR Infraprojects Ltd (GRIL)
787.57
-18.71%
2.73
L3
HG Infra Engineering Limited
862.11
-11.02%
77.27
L4
NKC Projects Private Ltd
871.27
-10.07%
86.43
L5
MS Infraengineers Pvt Ltd
899.07
-7.20%
114.23
L6
Ceigall India Ltd
900.00
-7.10%
115.16
L7
Barbrik Project Ltd
900.00
-7.10%
115.16
L8
RKD Construction Pvt Ltd
943.65
-2.60
158.81
L9
PNC Infratech
963.00
-0.60%
178.61
L10
Dineshchandra R. Agrawal Infracon Private Ltd (DRA)
997.00
2.91%
212.16
L11
Dilip Buildcon Ltd (DBL)
1,049.04
8.28%
264.20
L12
KCC Buildcon Private Ltd
1,073.00
10.75%
288.16
L13
Patel Infrastructure Limited
1092.64
12.78%
307.80